Engineering Manager
Morgan Sindall Infrastructure • London, England • Posted June 23, 2026
Position Overview
Would you like to work for an inclusive and collaborative company which is also one of the most successful within the UK infrastructure industry?
Metrowest 1b Scheme – Portishead to Bristol Temple Meads
Role Overview
The Metrowest 1b scheme will reinstate passenger rail services between Portishead and Bristol Temple Meads, improving regional connectivity and supporting sustainable transport.
This £80m programme includes:
- Construction of 4.5 km of disused railway between Pill and Portishead
- New stations at Pill and Portishead
- Highways and utility works
- Rock stabilisation and drainage
- Bridges, retaining walls, and other lineside civils
Delivery is planned from January 2026 to mid-2028 in collaboration with Network Rail.
Role Responsibilities